
This bundle contains three documents: IEEE Grid Vision 2050, IEEE Grid Vision 2050 Roadmap, and IEEE Grid Vision 2050 Reference Model. The IEEE Grid Vision 2050 describes the IEEE Power & Energy Society's (PES) vision of the power system infrastructure into the year 2050. This document sets the stage and includes future scenarios, electricity generation (Make), electricity transmission and distribution (Move), and electricity usage (Use). It also covers the related Operations and Control issues. This document also uses scenarios from the International Energy Agency (IEA), which defines future energy availability, production and usage into the year 2050. The goal of the IEEE Grid Vision 2050 Roadmap is to stimulate discussion and challenge ideas around the deployment of power and energy technologies. The IEEE PES Horizon 2050 team gives a general indication of when technologies could be expected for deployment, and the team takes a step forward and tries to group research and standard development needs for the required power and energy technologies in the future. The IEEE Grid Vision 2050 Reference Model summarizes the main concepts defined in the IEEE Grid Vision 2050; such as, reference models for energy usage, energy delivery, and energy operations and control. For Corporate or Institutional Access, request a custom quote for your organization at www.ieee.org/smartgridresearch
- Status
- Active Standard
- History
-
- Published:
- 2013-04-30
Working Group Details
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards