This newly developed guide compiles information on the application considerations of protective relays to ac transmission lines. The guide describes accepted transmission line protection schemes and the different electrical system parameters and situations that affect their application. Its purpose is to provide a reference for the selection of relay schemes and to assist less experienced protective relaying engineers in their application.
- Standard Committee
- PE/PSRCC - Power System Relaying and Control
- Status
- Superseded Standard
- Superseded by
- C37.113-2015
- Board Approval
- 1999-09-16
- History
-
- ANSI Approved:
- 2000-01-13
- Published:
- 2000-02-29
- Reaffirmed:
- 2004-12-08
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/PSRCC - Power System Relaying and Control
- Working Group
-
D5_WG - Working Group for Protective Relay Applications to Distribution Lines
- IEEE Program Manager
- Malia Zaman
Contact Malia Zaman - Working Group Chair
- William Waudby
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
C37.113-2015
IEEE Guide for Protective Relay Applications to Transmission Lines
Information on the concepts of protection of ac transmission lines is presented in this guide. Applications of the concepts to accepted transmission line-protection schemes are also presented. Many important issues, such as coordination of settings, operating times, characteristics of relays, mutual coupling of lines, automatic reclosing, and use of communication channels, are examined. Special protection systems, protection of multi-terminal lines, and single-phase tripping and reclosing are also included. The impact of different electrical parameters and system performance considerations on the selection of relays and protection schemes is discussed. The purpose of this guide is to provide a reference for the selection of relay schemes and to assist less experienced protective relaying engineers in applying protection schemes to transmission lines.
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards